Téléchargez les normes
home | What we do | Products & services | Our company | Our references | Contact | Site maps Environmental Policy
Our References

Customers
Sites
Date
Materials
ASF/Scetauroute
A837 motorway: Rochefort-Saintes
1995-1996
0/2 - 0/4 - 4/6 - 6/10 - 10/14 - 0/31.5 for emergency lanes and central reservations – 170 000 T
A87 motorway: Angers/Cholet Section
2001-2002
0/2 - 0/4 - 6/10 - 10/14 - 200 000 T
A10 motorway: Resurfacing
2003
6/10 for wearing course - 25.000 T

SAPRR/Scetauroute

A77 motorway, Dordives/Cosnes sur Loire, Lot Nord
1998-1999
0/2 - 2/6 - 10/14 for foundation and binder course - 500.000 T
Cofiroute/SCAO
A85 motorway, Angers-Tours
1995-1997
0/4 - 4/10 - 10/20 for road base asphalt - 0/2 - 6/10 - 10/14 for asphalt concrete - 27200 T
A10 motorway: regravelling north of Tours
1996
0/2 - 2/6 - 6/10 - 10/14 - 35 000 T
A10 motorway: resurfacing with draining asphalts
1997
0/2 - 8/10 - 30 000 T
A10 motorway, Sorigny services (Indre-et-Loire)
1997
0/2 - 2/6 - 6/10 - 10/14 - 51 000 T
A85 motorway, Le Teillet/Villefranche s/Cher Section
2000-2001
0/2 - 2/6 - 6/10 - 10/20 - 140 000 T | 0/2 - 2/6 - 6/10 - 60 000 T
A71 motorway, SALBRIS: resurfacing, maintenance
2000 et 2004
0/2 - 2/6 - 6/10 - 10/14 - 110 000 T
A10 motorway, Poitiers : resurfacing
2004
Materials for asphalt concrete - 15 000 T
A28 motorway, Ecommoy –Tours
2004-2005
Materials for road base asphalt and asphalt concrete - 300 000 T
A10 motorway: Château-Renault, enlargement to 3 lanes
2001-2005
Materials for road base asphalt and asphalt concrete - 220 000 T
SANEF/Colas
A1 motorway: resurfacing
2003
6/10 for wearing course - 20 000 T
RFF/SNCF
Supply of ballast for traditional and high-speed lines
1995-1999
Ballast - 1 053 000 T
Supply of ballast for traditional and high-speed lines
2000-2001
150 000 T
Supply of ballast for traditional lines
2002-2003-2004-2005
137.000 T - 99.000 T - 144.000 T -103.000 T
Supply of ballast for high-speed lines
2002-2003-2004
4.000 T - 5.000 T - 5.000 T
Supply of 0/31.5 base course and off 0/60 sub-grade materials
2002-2003-2004-2005
222.000 T - 223.000 T -125.000 T-30.000 T
Supply off 0/60 sub-grade materials
2002-2003-2004
222.000 T - 9.000 T - 90.000 T
DDE Indre-et-Loire (Departmental Public Works Directorate)
A85 motorway, Angers - Tours, Draye services
1998
0/60 - 111 000 T
A85 motorway, Angers - Tours
1999
0/2 - 2/6 - 6/10 - 10/14 - 80 000 T
A85 motorway, Angers - Tours
1999
0/31,5 et 0/60 - 74 000 T
A85 motorway, Angers - Tours
2001
0/2 - 2/6 - 6/10 - 10/14 - 85 000 T
Park
2002-2003-2004
Materials for surface dressing - 20 000T/an
DDE Loir-et-Cher (Departmental Public Works Directorate)
Park
2002-2003-2004
Materials for surface dressings and asphalts - 55 000 T/an
DDE Maine-et-Loire (Departmental Public Works Directorate)
Loire riverbank at Saumur
2004-2005
Riprap blocks 15/90 kg - 85 000 T
Race courses
Les Sables d’Olonnes race course track (Vendée)
1995
0/2 pink sand - 600 T
Chalans race course track
1997
0/2 pink sand - 800 T
Avanches race course track (Switzerland)
1998
0/2 pink sand - 4 000 T
Feurs race course track (Haute-Loire)
1998
0/2 pink sand - 2 700 T
Cordemais race course track (Loire-Atlantique)
1999
0/2 pink sand - 3 500 T
Colas
A10 Villorceaux motorway
1997
0/2 - 8/10 - 26 000 T
RD 759 minor road, Loudun/Thouars
2001
Asphalts - 10 000 T
Minor roads
2003
Supply of surface dressing materials - 28 000 T
Maintenance of minor roads in Deux-Sèvres
2004
Asphalts - 40 000 T
Colas-Eurovia-Charrier
RN 149 trunk road Bressuire diversion
1999
0/2 - 2/6 - 6/10 for asphalt concrete 0/2 - 2/6 - 6/10 - 10/14 for road base asphalt - 90 000 T
RD 938 minor road, Luzay Bouillé (Deux-Sèvres), enlargement to 3 lanes
1999-2000
Materials for road base asphalt – asphalt concrete – pit-run gravel - 435 000T
Eurovia
Orly airport
1995
0/2 - 0/4 - 4/6 - 6/10 - 10/14 - 57 000 T
Angers/Marcé aerodrome
1998
0/2 - 2/6 - 6/10 - 10/14 - 55 000 T
Resurfacing of Vienne trunk roads
2000
Hot mix asphalts - 18 000 T
RD 759 Loudun/Thouars minor road
2001
Pit-run gravel 0/31.5 - 0/60 - 15 000 T | Hot mix asphalts - 10 000 T
Colas-Eurovia
RD 725 minor road, Mirebeau – Lencloître
2003
0/31,5 - 17 000 T | Asphalts - 15 000 T
Appia
Chambray Les Tours ring road
2004
Ligex sand - 11 000 T
Screg – Appia
Ring road south of Tours
2004
Ligex gravel-sand mixture 30 000 T and asphalts 30.000 T
Eurovia - Colas -Appia
RD 760 minor road in Indre et Loire
2002-2003
Pit-run gravel b - 30 000 T
Routière Morin
A19 motorway, Sens-Courtenay
1996-1997
0/2 - 2/4 - 4/10 for rutting resistant asphaltic concrete - 100 000 T
Screg
RD 957 minor road Epuizay rest area (Loir-et Cher)
1998
0/2 - 2/6 - 6/10 - 24 000 T
Maine-et-Loire minor roads
2003
Supply of materials for asphalt - 17 000 T
Valérian
A10/RN10 link road Tours South
2000
0/60 - 30 000 T
CASINO LA RICHE site
2001
0/60 - 110 000 T
SCREG-Eurovia-Colas
RD 140 St-Martin le Beau minor road
2001
0/31,5 - 20 000 T | Materials for asphalts - 40 000 T
Malet
A85 motorway, Cinq Mars La Pile
2001
0/60 - 25 000 T
SCR-STPVL
RD 760 minor road, Bossé
2001
Graded gravel 0/20 - 14 000 T | 0/31,5 - 4 000 T
SPME-SBE
A6 motorway
2001
0/2 - 2/6 - 6/10 - 10/14 - 17 000 T
EJL-GTM-TPPL
A85 motorway, Angers
1999
0/60 - 17 000 T

BP n°1 - 79330 SAINT-VARENT / FRANCE / Tel. +33 (0)5 49 67 54 33 / Fax +33 (0)5 49 67 54 08
E-mail : contact@carrieresroy.com / http://www.carrieresroy.com